2018 : Analysis on the Critical Conditions of Side-by-Side Offloading Operation between SSP Type-FPSO and Shuttle Tanker

Prof. Ir. Eko Budi Djatmiko M.Sc Ph.D


Abstract

Article PreviewArticle PreviewArticle PreviewEvaluation is carried out on the operability of a 87,900 ton Sevan Stabilized Platform (SSP) functioned as an FPSO in the hypothetical operational site of Masela Block. This is to observe the critical conditions when side-by-side (SBS) offloading is performed between the SSP and a 35,000 DWT shuttle tanker. The first stage of analysis conducted on the moored SSP as a single floating body indicates the capability to withstand a 100-year wave, designated by the significant height of 8.0 m. Largest motions are experienced when SSP contains 75% load capacity, resulting in the mooring tension range from 2,000 kN up to 7,000 kN, portraying ample safety factors of 2.0 up to 3.0. The second stage of analysis is conducted for execution of SBS offloading from SSP to shuttle tanker, positioned in a 3.3 m distance. Observation is made when SSP is loaded with 100%, 83%, and …