2015 : Developing methodology for cradle to grave cost planning for industrialised building system (IBS) In Malaysia

Dr Christiono Utomo S.T., M.T.


Abstract

This paper presents a proposed research methodology undertaken by a researcher to investigate the most accurate and appropriate method to generate a cradle to grave cost planning for Industrialised Building System (IBS) in the Malaysian construction industry. The methodology was intended to bring out accurate results and provide useful sources for the induction of emerging insights relating to the problem identified, which is how the current cost planning used for IBS projects helps in terms of cost control from pre-contract until the demolition of the building. At the end of this research, a proposed cradle to grave cost planning method was produced. To achieve the aims and objectives of this research, both quantitative and qualitative methods were applied. A quantitative research method in the form of a questionnaire survey was conducted to investigate which method is mostly used in preparing cost planning for …