2021 : ANALYSIS OF TIME AND COST THECONSTUCTION OF ROYAL SENTUL PARKAPARTMENT USING PRECAST HALF SLABMODIFICATION ON FLOOR 8 –15

Ir. RA Triaswati Moeljono N M.Kes

Year

2021

Published in

-

External link

Type

RESEARCH

Keywords

-


Abstract

The construction project of Royal Sentul Park Apartment is locatedat the Sentul KM Circuit Toll Exit. 33, Jalan Sentul Raya,Kadumanggu, Babakan Madang, Bogor. This apartment has a landarea of 25,461 m2 and building area of 5402,257 m2. Thisapartment has 2 floors basement and 34 floorsupper structure. Theconstruction project, used cast in situ method (conventionalcasting method).As a consideration for the acceleration of project development, inthe final project, the calculation of time and cost to review thebasement floor structure to the 15th upper floor by modifying themethod used on a typical floor, namely floors 8 to 15 floors.The time calculation refers to the time schedule using the Microsoftproject program and the cost calculation refers to the survey priceandMinisterial Regulation No. 11 / PRT / M 2013.Based on the results of the analysis of the calculation of thedifference in execution time during 11 days and the cost of Rp1,775,764,360.29. By providing a comparison of theimplementation time and construction costs using differentmethods, it is expected to achieve the expected time and cost.